Water management constructionFlood-sediment removal from the Elbe
Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management construction
Dolní Dobrouč · 2026
Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.
Water management constructionRemoval of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Repair and maintenance of the existing trained channel — restoring its original capacity by dredging sediment across the full reach and securing undermined stone structures. Surplus material was hauled to a licensed landfill.
Lesy ČR
Maintenance works within the built-up areas of Dlouhomilov (river km 5.90–6.35) and Hrabišín (river km 7.40–9.95) — sediment removal and tree felling.
Lesy ČR

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.