Removal of sediment from 550 m of trained channel running through the built-up area of Dobruška. The channel is revetted with walls on both banks 1.6–2.4 m high including concrete copings, with a paved bed and a width of 3.5–5 m. A total of 336.9 m³ of sediment, densely overgrown with aquatic plants across 949.5 m², was dredged.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.