Water management construction

Kotelská strouha, river km 0.000–0.541, sediment dredging

2023

Field
Water management construction
Year completed
2023
Client
Lesy ČR

Dredging of sediment over the full 737 m and reshaping of the channel to a trapezoidal profile. The work allowed for existing sewer outfall pipes, with any damage repaired.

From this field

All references
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Water management construction

Hradečná, km 0.000–2.610, sediment removal

Repair and maintenance of the existing trained channel — restoring its original capacity by dredging sediment across the full reach and securing undermined stone structures. Surplus material was hauled to a licensed landfill.

Lesy ČR

2024