Water management constructionFlood-sediment removal from the Elbe
Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management construction
Nová Ves · 2019
Backfilling of bank scour holes and repair of the bank revetment with hand-placed stone pitching founded on a riprap toe.
Water management constructionRemoval of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management constructionChannel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.
Lesy ČR
Dredging of sediment and repair of damaged bank revetment. The works also included repair of the existing drop structure.
Povodí Moravy

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.