Water management construction

Mateřovský potok, Starý Mateřov, sediment removal, river km 0.400–1.530

Starý Mateřov · 2024

Field
Water management construction
Location
Starý Mateřov
Year completed
2024
Client
Povodí Labe

Removal of sediment and trees from the flow profile and mowing of grass in the Mateřovský potok channel, restoring its original capacity and sound technical condition.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026

Tell us what you need

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.

CallGet a quote