Water management construction

Watercourse channel repair

2018

Field
Water management construction
Year completed
2018
Client
Povodí

Clearing of trees and shrubs from the flow profile, excavation of surplus soil from the channel, revetment of the concave banks on bends, reshaping of the channel slopes and haulage of soil to landfill over 1.530 km.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026