Water management construction

Smržovský potok, Smržov, channel repair, river km 3.220–3.675

Smržov · 2018

Field
Water management construction
Location
Smržov
Year completed
2018
Client
Povodí Labe

Repair of the watercourse revetment — dismantling of the damaged existing revetment and laying of quarry-stone paving on a sand-and-gravel bed with pointed joints.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026

Tell us what you need

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.

CallGet a quote